How we build
Six steps. One written price. No surprises.
Most homes take 9 to 11 months from the first walk on your land to the day you get the keys. Here's exactly what happens, and what you'll get in writing along the way.
The six steps
From first walk to move-in
Walk the land
We meet you on your lot, free. We look at slope, sun, soil, access, well and septic, and where the house wants to sit.
Design
Start from a plan, change one, or design from scratch with our in-house designer. Two rounds of changes are included.
Written price
A fixed, line-by-line price. No vague allowances hiding the real number. You sign only when it makes sense.
Permits
We file with the county, answer the inspectors and handle the paperwork. You don't stand in line anywhere.
Build
One crew, one project lead. Visit the site anytime with your lead. Every Friday you get photos and a short note.
Keys and care
A final walkthrough with a punch list we finish before you move in. Then we stay: a visit at 11 months to fix anything that settled.
The whole timeline
About 10 months, most of it building
Design and permits take about four months. That's the part you can speed up by deciding quickly.
Questions
What people ask before they build
Don't see yours? Claire answers the phone and knows the answers.
Call (555) 018-4470 →Can you build on land I already own?
Yes. Most of our homes are built on the owner's land. We'll walk it with you for free first and tell you if anything would make it expensive, like rock, slope or a long driveway.
What if I change my mind during the build?
You can. We write up the change with its cost and any time it adds, and nothing happens until you sign it.
How do I pay for it?
Most families use a construction loan, which turns into a regular mortgage at move-in. We work with three local lenders and can introduce you.
Can I visit the site?
Anytime with your project lead, and we schedule walkthroughs at framing and before drywall so you can see what's inside the walls.
What does the warranty cover?
One year on workmanship, like trim, doors and paint. Ten years on structure: foundation, framing and roof. It's in your contract.
What makes a project go over budget?
Usually changes after the price is signed, or surprises in the ground. We test the soil before pricing and show every change's cost before doing it.
Step one is free
Let's start with a walk on your land
An hour with a builder, no obligation. You'll leave with a rough budget and a clear idea of what's possible.